on Excelsior, the west bound lane closest to their site will be closed at 6 am to set up the pump truck so it is ready to pump by 8 am.
On east bound Lake, the two east bound lanes will be closed leaving one east bound lane shifted into he left turn lane, vehicles will move to the turn lane to get around the pump and concrete trucks before getting back to two lanes. An off duty police officer will help control the left turn if vehicles need to make the left turn. The traffic control will be set up at 8:30 am on east bound Lake St.
Both the east bound lanes on Lake and the one west bound lane on Excelsior should be open by 3 pm although it could go a little past 3 pm.
The signal group is aware and will adjust timing as much as possible.
The goal is to be done by 3 pm same day.